Vande Bharat train: Soon, passengers will be able to sleep while traveling in Vande Bharat trains. The sleeper Vande Bharat will be brought by the Ministry of Railways. To ensure that passengers can travel comfortably over long distances, the Sleeper Vande Bharat will be operated.
Sleeper Vande Bharat train to be ready in 2025:
This has been put out to bid on, and the work is also prepared to be awarded soon. After the work is awarded, the sleeper train will be ready in 24 months. Thus, the sleeper will arrive on the Vande Bharat track in 2025.
Currently, there is every chance to concentrate on the infrastructure of railways in the budget. There will be an increase in the number of semi-high-speed trains like Railway Vande Bharat operating. Currently, 200 sleeper Vande Bharat trains are up for bid by the railways. Train production work is also getting ready to be awarded soon.
In 24 months, or two years after the work was awarded, the sleeper Vande Bharat train will be ready, according to the Ministry of Railways. Travelers will be able to take the sleeper Vande Bharat train as a result in the year 2025. The number of regular and sleeper Vande Bharat trains will rise further as infrastructure is made a priority.
More about the sleeper Vande Bharat train:
Currently, the eight Vande Bharat trains are successfully operating in various states across the nation. On February 10 2023, two additional trains on various routes will depart from Mumbai. In this way, the operation of a total of 10 Vande Bharat trains will start this month itself.
To completely replace the current trains, it is proposed for the production of 6500 aluminium coaches, 1240 locomotives, and roughly 35,000 wagons. Due to their lighter weight, aluminium coaches use less energy.