{"id":1308885,"date":"2026-04-27T10:36:22","date_gmt":"2026-04-27T05:06:22","guid":{"rendered":"https:\/\/trak.in\/stories\/?p=1308885"},"modified":"2026-04-27T10:36:34","modified_gmt":"2026-04-27T05:06:34","slug":"mumbai-metro-line-5a-approved-with-rs-18130-crore-budget-thane-to-ulhasnagar","status":"publish","type":"post","link":"https:\/\/trak.in\/stories\/mumbai-metro-line-5a-approved-with-rs-18130-crore-budget-thane-to-ulhasnagar\/","title":{"rendered":"Mumbai Metro Line 5a Approved With Rs 18,130 Crore Budget: Thane To Ulhasnagar"},"content":{"rendered":"\n<p>In a major infrastructure push, the Maharashtra government has approved the expansion of Mumbai Metro Line 5 along with a new extension\u2014<strong>Metro Line 5A<\/strong>. The project, worth over <strong>\u20b918,130 crore<\/strong>, is set to transform connectivity across the rapidly growing Thane\u2013Bhiwandi\u2013Kalyan\u2013Ulhasnagar belt.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"731\" src=\"https:\/\/trak.in\/stories\/wp-content\/uploads\/2026\/04\/Screenshot-2026-04-27-at-10.35.38-AM-1024x731.png\" alt=\"\" class=\"wp-image-1308889\" srcset=\"https:\/\/trak.in\/stories\/wp-content\/uploads\/2026\/04\/Screenshot-2026-04-27-at-10.35.38-AM-1024x731.png 1024w, https:\/\/trak.in\/stories\/wp-content\/uploads\/2026\/04\/Screenshot-2026-04-27-at-10.35.38-AM-300x214.png 300w, https:\/\/trak.in\/stories\/wp-content\/uploads\/2026\/04\/Screenshot-2026-04-27-at-10.35.38-AM-768x548.png 768w, https:\/\/trak.in\/stories\/wp-content\/uploads\/2026\/04\/Screenshot-2026-04-27-at-10.35.38-AM.png 1524w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">What Is Metro Line 5A?<\/h2>\n\n\n\n<p>Metro Line 5A is essentially an <strong>extension of the existing Metro Line 5 corridor<\/strong>, designed to bridge connectivity gaps after route changes in the original plan.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Length: <strong>~11.83 km<\/strong><\/li>\n\n\n\n<li>Stations: <strong>7 stations<\/strong><\/li>\n\n\n\n<li>Route: <strong>Durgadi \u2192 Aadharwadi \u2192 Khadakpada \u2192 Kalyan \u2192 Ulhasnagar<\/strong><\/li>\n<\/ul>\n\n\n\n<p>Originally, Metro Line 5 was supposed to extend fully to Kalyan. However, due to planning changes, it now ends at Durgadi\u2014making Line 5A critical to completing the corridor.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Bigger Network: Integrated Corridor Vision<\/h2>\n\n\n\n<p>Together, Metro Line 5 + 5A will form a <strong>~34 km long integrated metro network with 19 stations<\/strong>, significantly improving urban mobility in the Mumbai Metropolitan Region (MMR).<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Key Areas Connected:<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Thane<\/li>\n\n\n\n<li>Bhiwandi<\/li>\n\n\n\n<li>Kalyan<\/li>\n\n\n\n<li>Ulhasnagar<\/li>\n<\/ul>\n\n\n\n<p>This region is one of the fastest-growing suburban clusters, with heavy daily commuter traffic.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Engineering &amp; Design Highlights<\/h2>\n\n\n\n<p>6<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Key Infrastructure Features:<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Double-Decker Corridor<\/strong><br>A unique engineering feature between Ranjnoli Junction and Durgadi combines a <strong>metro line + flyover<\/strong>, optimizing space and reducing congestion.<\/li>\n\n\n\n<li><strong>Hybrid Alignment (Elevated + Underground)<\/strong><br>Certain stretches, especially in dense areas like Bhiwandi\u2013Kalyan, have been converted to underground to reduce disruption.<\/li>\n\n\n\n<li><strong>Interconnectivity<\/strong><br>The corridor will link with other metro lines and existing rail networks, creating a seamless transit ecosystem.<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Why This Project Matters<\/h2>\n\n\n\n<p>This is not just another metro expansion\u2014it\u2019s a <strong>regional mobility upgrade<\/strong>:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Expected to benefit <strong>lakhs of daily commuters<\/strong><\/li>\n\n\n\n<li>Will <strong>cut travel time significantly<\/strong> across Thane\u2013Kalyan belt<\/li>\n\n\n\n<li>Reduces road congestion in high-density zones<\/li>\n\n\n\n<li>Boosts real estate and economic growth in suburbs<\/li>\n<\/ul>\n\n\n\n<p>The project had faced delays due to land acquisition and rehabilitation challenges, but this approval signals renewed momentum.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Key Details at a Glance<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Feature<\/th><th>Details<\/th><\/tr><\/thead><tbody><tr><td>Project Name<\/td><td>Mumbai Metro Line 5 + 5A<\/td><\/tr><tr><td>Total Length<\/td><td>~34 km<\/td><\/tr><tr><td>Line 5A Length<\/td><td>~11.83 km<\/td><\/tr><tr><td>Stations<\/td><td>19 total (7 in Line 5A)<\/td><\/tr><tr><td>Cost<\/td><td>\u20b918,130 crore<\/td><\/tr><tr><td>Key Cities<\/td><td>Thane, Bhiwandi, Kalyan, Ulhasnagar<\/td><\/tr><tr><td>Special Feature<\/td><td>Double-decker metro + flyover<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">The Bigger Picture<\/h2>\n\n\n\n<p>Mumbai\u2019s metro network is rapidly expanding into a <strong>multi-line, high-capacity urban transit grid<\/strong>. With Line 5A, the focus is shifting toward <strong>suburban integration<\/strong>, not just city connectivity.<\/p>\n\n\n\n<p>For millions living beyond central Mumbai, this project could redefine daily commuting\u2014making it faster, smarter, and far more efficient.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Summary<\/h2>\n\n\n\n<p>Maharashtra has approved Mumbai Metro Line 5A, an 11.83 km extension connecting Durgadi to Kalyan and Ulhasnagar. Part of a \u20b918,130 crore project, the integrated 34 km corridor will link Thane, Bhiwandi, and Kalyan. Featuring double-decker infrastructure and improved connectivity, it is expected to ease congestion, cut travel time, and boost suburban mobility across the Mumbai Metropolitan Region.<\/p>\n\n\n\n<p><a href=\"https:\/\/www.constructionworld.in\/transport-infrastructure\/metro-rail-and-railways-infrastructure\/-mumbai-metro-line-5--thane-kalyan-line-gets-crz-clearance-\/26506\">Image Source<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>In a major infrastructure push, the Maharashtra government has approved the expansion of Mumbai Metro Line 5 along with a new extension\u2014Metro Line 5A. The project, worth over \u20b918,130 crore, is set to transform connectivity across the rapidly growing Thane\u2013Bhiwandi\u2013Kalyan\u2013Ulhasnagar belt. What Is Metro Line 5A? Metro Line 5A is essentially an extension of the [&hellip;]<\/p>\n","protected":false},"author":30,"featured_media":1308889,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[21],"tags":[9792,595],"class_list":["post-1308885","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-business","tag-line-5a","tag-mumbai-metro"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.9 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Mumbai Metro Line 5a Approved With Rs 18,130 Crore Budget: Thane To Ulhasnagar - Trak.in - Indian Business of Tech, Mobile &amp; Startups<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/trak.in\/stories\/mumbai-metro-line-5a-approved-with-rs-18130-crore-budget-thane-to-ulhasnagar\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Mumbai Metro Line 5a Approved With Rs 18,130 Crore Budget: Thane To Ulhasnagar - Trak.in - Indian Business of Tech, Mobile &amp; Startups\" \/>\n<meta property=\"og:description\" content=\"In a major infrastructure push, the Maharashtra government has approved the expansion of Mumbai Metro Line 5 along with a new extension\u2014Metro Line 5A. The project, worth over \u20b918,130 crore, is set to transform connectivity across the rapidly growing Thane\u2013Bhiwandi\u2013Kalyan\u2013Ulhasnagar belt. What Is Metro Line 5A? Metro Line 5A is essentially an extension of the [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/trak.in\/stories\/mumbai-metro-line-5a-approved-with-rs-18130-crore-budget-thane-to-ulhasnagar\/\" \/>\n<meta property=\"og:site_name\" content=\"Trak.in - Indian Business of Tech, Mobile &amp; Startups\" \/>\n<meta property=\"article:published_time\" content=\"2026-04-27T05:06:22+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-27T05:06:34+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/trak.in\/stories\/wp-content\/uploads\/2026\/04\/Screenshot-2026-04-27-at-10.35.38-AM-1024x731.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"731\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Mohul Ghosh\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Mohul Ghosh\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/trak.in\/stories\/mumbai-metro-line-5a-approved-with-rs-18130-crore-budget-thane-to-ulhasnagar\/\",\"url\":\"https:\/\/trak.in\/stories\/mumbai-metro-line-5a-approved-with-rs-18130-crore-budget-thane-to-ulhasnagar\/\",\"name\":\"Mumbai Metro Line 5a Approved With Rs 18,130 Crore Budget: Thane To Ulhasnagar - Trak.in - Indian Business of Tech, Mobile &amp; Startups\",\"isPartOf\":{\"@id\":\"https:\/\/trak.in\/stories\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/trak.in\/stories\/mumbai-metro-line-5a-approved-with-rs-18130-crore-budget-thane-to-ulhasnagar\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/trak.in\/stories\/mumbai-metro-line-5a-approved-with-rs-18130-crore-budget-thane-to-ulhasnagar\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/trak.in\/stories\/wp-content\/uploads\/2026\/04\/Screenshot-2026-04-27-at-10.35.38-AM.png\",\"datePublished\":\"2026-04-27T05:06:22+00:00\",\"dateModified\":\"2026-04-27T05:06:34+00:00\",\"author\":{\"@id\":\"https:\/\/trak.in\/stories\/#\/schema\/person\/5092a7d2906e3f3c819643435477c2a7\"},\"breadcrumb\":{\"@id\":\"https:\/\/trak.in\/stories\/mumbai-metro-line-5a-approved-with-rs-18130-crore-budget-thane-to-ulhasnagar\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/trak.in\/stories\/mumbai-metro-line-5a-approved-with-rs-18130-crore-budget-thane-to-ulhasnagar\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/trak.in\/stories\/mumbai-metro-line-5a-approved-with-rs-18130-crore-budget-thane-to-ulhasnagar\/#primaryimage\",\"url\":\"https:\/\/trak.in\/stories\/wp-content\/uploads\/2026\/04\/Screenshot-2026-04-27-at-10.35.38-AM.png\",\"contentUrl\":\"https:\/\/trak.in\/stories\/wp-content\/uploads\/2026\/04\/Screenshot-2026-04-27-at-10.35.38-AM.png\",\"width\":1524,\"height\":1088},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/trak.in\/stories\/mumbai-metro-line-5a-approved-with-rs-18130-crore-budget-thane-to-ulhasnagar\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/trak.in\/stories\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Mumbai Metro Line 5a Approved With Rs 18,130 Crore Budget: Thane To Ulhasnagar\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/trak.in\/stories\/#website\",\"url\":\"https:\/\/trak.in\/stories\/\",\"name\":\"Trak.in - Indian Business of Tech, Mobile &amp; Startups\",\"description\":\"Trak.in is a popular Indian Business, Technology, Mobile &amp; Startup blog featuring trending News, views and analytical take on Technology, Business, Finance, Telecom, Mobile, startups &amp; Social Media Space\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/trak.in\/stories\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/trak.in\/stories\/#\/schema\/person\/5092a7d2906e3f3c819643435477c2a7\",\"name\":\"Mohul Ghosh\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/trak.in\/stories\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/66c129d83dd3f325a3b550eb1aa16891173ddfc4686361424206cd9a01311c89?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/66c129d83dd3f325a3b550eb1aa16891173ddfc4686361424206cd9a01311c89?s=96&d=mm&r=g\",\"caption\":\"Mohul Ghosh\"},\"url\":\"https:\/\/trak.in\/stories\/author\/mohul-ghosh\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Mumbai Metro Line 5a Approved With Rs 18,130 Crore Budget: Thane To Ulhasnagar - Trak.in - Indian Business of Tech, Mobile &amp; Startups","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/trak.in\/stories\/mumbai-metro-line-5a-approved-with-rs-18130-crore-budget-thane-to-ulhasnagar\/","og_locale":"en_US","og_type":"article","og_title":"Mumbai Metro Line 5a Approved With Rs 18,130 Crore Budget: Thane To Ulhasnagar - Trak.in - Indian Business of Tech, Mobile &amp; Startups","og_description":"In a major infrastructure push, the Maharashtra government has approved the expansion of Mumbai Metro Line 5 along with a new extension\u2014Metro Line 5A. The project, worth over \u20b918,130 crore, is set to transform connectivity across the rapidly growing Thane\u2013Bhiwandi\u2013Kalyan\u2013Ulhasnagar belt. What Is Metro Line 5A? Metro Line 5A is essentially an extension of the [&hellip;]","og_url":"https:\/\/trak.in\/stories\/mumbai-metro-line-5a-approved-with-rs-18130-crore-budget-thane-to-ulhasnagar\/","og_site_name":"Trak.in - Indian Business of Tech, Mobile &amp; Startups","article_published_time":"2026-04-27T05:06:22+00:00","article_modified_time":"2026-04-27T05:06:34+00:00","og_image":[{"width":1024,"height":731,"url":"https:\/\/trak.in\/stories\/wp-content\/uploads\/2026\/04\/Screenshot-2026-04-27-at-10.35.38-AM-1024x731.png","type":"image\/png"}],"author":"Mohul Ghosh","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Mohul Ghosh","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/trak.in\/stories\/mumbai-metro-line-5a-approved-with-rs-18130-crore-budget-thane-to-ulhasnagar\/","url":"https:\/\/trak.in\/stories\/mumbai-metro-line-5a-approved-with-rs-18130-crore-budget-thane-to-ulhasnagar\/","name":"Mumbai Metro Line 5a Approved With Rs 18,130 Crore Budget: Thane To Ulhasnagar - Trak.in - Indian Business of Tech, Mobile &amp; Startups","isPartOf":{"@id":"https:\/\/trak.in\/stories\/#website"},"primaryImageOfPage":{"@id":"https:\/\/trak.in\/stories\/mumbai-metro-line-5a-approved-with-rs-18130-crore-budget-thane-to-ulhasnagar\/#primaryimage"},"image":{"@id":"https:\/\/trak.in\/stories\/mumbai-metro-line-5a-approved-with-rs-18130-crore-budget-thane-to-ulhasnagar\/#primaryimage"},"thumbnailUrl":"https:\/\/trak.in\/stories\/wp-content\/uploads\/2026\/04\/Screenshot-2026-04-27-at-10.35.38-AM.png","datePublished":"2026-04-27T05:06:22+00:00","dateModified":"2026-04-27T05:06:34+00:00","author":{"@id":"https:\/\/trak.in\/stories\/#\/schema\/person\/5092a7d2906e3f3c819643435477c2a7"},"breadcrumb":{"@id":"https:\/\/trak.in\/stories\/mumbai-metro-line-5a-approved-with-rs-18130-crore-budget-thane-to-ulhasnagar\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/trak.in\/stories\/mumbai-metro-line-5a-approved-with-rs-18130-crore-budget-thane-to-ulhasnagar\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/trak.in\/stories\/mumbai-metro-line-5a-approved-with-rs-18130-crore-budget-thane-to-ulhasnagar\/#primaryimage","url":"https:\/\/trak.in\/stories\/wp-content\/uploads\/2026\/04\/Screenshot-2026-04-27-at-10.35.38-AM.png","contentUrl":"https:\/\/trak.in\/stories\/wp-content\/uploads\/2026\/04\/Screenshot-2026-04-27-at-10.35.38-AM.png","width":1524,"height":1088},{"@type":"BreadcrumbList","@id":"https:\/\/trak.in\/stories\/mumbai-metro-line-5a-approved-with-rs-18130-crore-budget-thane-to-ulhasnagar\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/trak.in\/stories\/"},{"@type":"ListItem","position":2,"name":"Mumbai Metro Line 5a Approved With Rs 18,130 Crore Budget: Thane To Ulhasnagar"}]},{"@type":"WebSite","@id":"https:\/\/trak.in\/stories\/#website","url":"https:\/\/trak.in\/stories\/","name":"Trak.in - Indian Business of Tech, Mobile &amp; Startups","description":"Trak.in is a popular Indian Business, Technology, Mobile &amp; Startup blog featuring trending News, views and analytical take on Technology, Business, Finance, Telecom, Mobile, startups &amp; Social Media Space","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/trak.in\/stories\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/trak.in\/stories\/#\/schema\/person\/5092a7d2906e3f3c819643435477c2a7","name":"Mohul Ghosh","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/trak.in\/stories\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/66c129d83dd3f325a3b550eb1aa16891173ddfc4686361424206cd9a01311c89?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/66c129d83dd3f325a3b550eb1aa16891173ddfc4686361424206cd9a01311c89?s=96&d=mm&r=g","caption":"Mohul Ghosh"},"url":"https:\/\/trak.in\/stories\/author\/mohul-ghosh\/"}]}},"jetpack_featured_media_url":"https:\/\/trak.in\/stories\/wp-content\/uploads\/2026\/04\/Screenshot-2026-04-27-at-10.35.38-AM.png","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/posts\/1308885","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/users\/30"}],"replies":[{"embeddable":true,"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/comments?post=1308885"}],"version-history":[{"count":1,"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/posts\/1308885\/revisions"}],"predecessor-version":[{"id":1308890,"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/posts\/1308885\/revisions\/1308890"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/media\/1308889"}],"wp:attachment":[{"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/media?parent=1308885"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/categories?post=1308885"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/tags?post=1308885"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}