{"id":1308120,"date":"2026-04-08T09:14:49","date_gmt":"2026-04-08T03:44:49","guid":{"rendered":"https:\/\/trak.in\/stories\/?p=1308120"},"modified":"2026-04-08T09:15:06","modified_gmt":"2026-04-08T03:45:06","slug":"indias-1st-pod-taxi-project-starts-at-bkc-mumbai-with-rs-1000-cr-budget","status":"publish","type":"post","link":"https:\/\/trak.in\/stories\/indias-1st-pod-taxi-project-starts-at-bkc-mumbai-with-rs-1000-cr-budget\/","title":{"rendered":"India&#8217;s 1st Pod Taxi Project Starts At BKC, Mumbai With Rs 1000 Cr Budget"},"content":{"rendered":"\n<p>Mumbai has taken a major step toward futuristic urban mobility, with the <strong>groundbreaking (e-bhoomipujan) of India\u2019s first pod taxi project<\/strong> held at Bandra-Kurla Complex (BKC). The project marks the beginning of a <strong>driverless, on-demand transport system<\/strong> aimed at solving last-mile connectivity issues in one of the city\u2019s busiest business districts.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"686\" src=\"https:\/\/trak.in\/stories\/wp-content\/uploads\/2026\/04\/Screenshot-2026-04-08-at-9.14.11-AM-1024x686.png\" alt=\"\" class=\"wp-image-1308125\" srcset=\"https:\/\/trak.in\/stories\/wp-content\/uploads\/2026\/04\/Screenshot-2026-04-08-at-9.14.11-AM-1024x686.png 1024w, https:\/\/trak.in\/stories\/wp-content\/uploads\/2026\/04\/Screenshot-2026-04-08-at-9.14.11-AM-300x201.png 300w, https:\/\/trak.in\/stories\/wp-content\/uploads\/2026\/04\/Screenshot-2026-04-08-at-9.14.11-AM-768x515.png 768w, https:\/\/trak.in\/stories\/wp-content\/uploads\/2026\/04\/Screenshot-2026-04-08-at-9.14.11-AM.png 1268w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">What Is the BKC Pod Taxi Project?<\/h2>\n\n\n\n<p>The pod taxi system is a <strong>Personal Rapid Transit (PRT)<\/strong> network featuring:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Small <strong>driverless pods<\/strong> carrying around 4\u20136 passengers<\/li>\n\n\n\n<li>Fully <strong>automated, electric vehicles<\/strong> running on elevated tracks<\/li>\n\n\n\n<li><strong>On-demand stops<\/strong>, reducing travel time by skipping unused stations<\/li>\n<\/ul>\n\n\n\n<p>The system is designed to operate at speeds of up to <strong>40 km\/h<\/strong>, offering a faster and more efficient alternative to road-based transport.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Route, Length &amp; Connectivity<\/h2>\n\n\n\n<p>The project will be developed in phases, with a larger long-term network planned:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Total planned network: <strong>~8.8 km across BKC<\/strong><\/li>\n\n\n\n<li>Around <strong>30\u201338 stations<\/strong> connecting key commercial zones<\/li>\n\n\n\n<li>Links between <strong>Bandra and Kurla railway stations<\/strong><\/li>\n\n\n\n<li>Integration with <strong>Metro Line 3 and Line 2B<\/strong><\/li>\n<\/ul>\n\n\n\n<p>The system is expected to significantly improve <strong>first- and last-mile connectivity<\/strong>, especially for office commuters.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Phase 1 Details and Timeline<\/h2>\n\n\n\n<p>The first phase of the project has now officially begun:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Initial stretch: <strong>3.3 km corridor<\/strong><\/li>\n\n\n\n<li>Key locations: Kurla, LBS Marg, Kalanagar, BKC zones<\/li>\n\n\n\n<li>Expected completion timeline: <strong>around 20 months<\/strong><\/li>\n<\/ul>\n\n\n\n<p>Once operational, the pods will run at short intervals, ensuring minimal waiting time for passengers.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Cost and Execution Model<\/h2>\n\n\n\n<p>The project is estimated to cost around <strong>\u20b91,000\u2013\u20b91,016 crore<\/strong> and will be developed using a <strong>Public-Private Partnership (PPP) model<\/strong>.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>No direct financial burden on the state government<\/li>\n\n\n\n<li>Private players will handle construction and operations<\/li>\n\n\n\n<li>Long-term concession model for revenue generation<\/li>\n<\/ul>\n\n\n\n<p>This makes it one of India\u2019s most ambitious <strong>urban mobility experiments<\/strong>.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Why This Project Matters<\/h2>\n\n\n\n<p>The BKC pod taxi system is being positioned as a solution to:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Severe <strong>traffic congestion in BKC<\/strong><\/li>\n\n\n\n<li>Lack of seamless last-mile connectivity<\/li>\n\n\n\n<li>Overdependence on autos, taxis, and private vehicles<\/li>\n<\/ul>\n\n\n\n<p>Officials estimate that the system could eventually serve <strong>over 1 lakh daily commuters<\/strong>, transforming how people travel within the business district.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Parallel Infrastructure Push: Thane\u2013Borivali Tunnel<\/h2>\n\n\n\n<p>Alongside the pod taxi project, work has also begun on the <strong>Thane\u2013Borivali twin tunnel<\/strong>, another major infrastructure initiative aimed at:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Cutting travel time between Thane and Borivali to minutes<\/li>\n\n\n\n<li>Reducing congestion on existing routes<\/li>\n\n\n\n<li>Improving east-west connectivity in Mumbai<\/li>\n<\/ul>\n\n\n\n<p>Both projects signal a broader push toward <strong>next-gen transport infrastructure<\/strong> in the Mumbai Metropolitan Region.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Challenges and Concerns<\/h2>\n\n\n\n<p>Despite its promise, the project faces some challenges:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Land acquisition and inter-agency coordination issues<\/li>\n\n\n\n<li>Environmental concerns, including tree cutting<\/li>\n\n\n\n<li>Questions around fare pricing and long-term viability<\/li>\n<\/ul>\n\n\n\n<p>However, authorities remain optimistic about execution timelines and impact.<\/p>\n\n\n\n<p><a href=\"https:\/\/swarajyamag.com\/news-brief\/groundbreaking-held-for-indias-first-pod-taxi-project-in-bkc-tunnelling-begins-for-thaneborivali-twin-tunnel\">Image Source<\/a><\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\"><\/h2>\n","protected":false},"excerpt":{"rendered":"<p>Mumbai has taken a major step toward futuristic urban mobility, with the groundbreaking (e-bhoomipujan) of India\u2019s first pod taxi project held at Bandra-Kurla Complex (BKC). The project marks the beginning of a driverless, on-demand transport system aimed at solving last-mile connectivity issues in one of the city\u2019s busiest business districts. What Is the BKC Pod [&hellip;]<\/p>\n","protected":false},"author":30,"featured_media":1308125,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[21],"tags":[1303,8967],"class_list":["post-1308120","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-business","tag-bkc","tag-pod-taxi"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.9 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>India&#039;s 1st Pod Taxi Project Starts At BKC, Mumbai With Rs 1000 Cr Budget - Trak.in - Indian Business of Tech, Mobile &amp; Startups<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/trak.in\/stories\/indias-1st-pod-taxi-project-starts-at-bkc-mumbai-with-rs-1000-cr-budget\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"India&#039;s 1st Pod Taxi Project Starts At BKC, Mumbai With Rs 1000 Cr Budget - Trak.in - Indian Business of Tech, Mobile &amp; Startups\" \/>\n<meta property=\"og:description\" content=\"Mumbai has taken a major step toward futuristic urban mobility, with the groundbreaking (e-bhoomipujan) of India\u2019s first pod taxi project held at Bandra-Kurla Complex (BKC). The project marks the beginning of a driverless, on-demand transport system aimed at solving last-mile connectivity issues in one of the city\u2019s busiest business districts. What Is the BKC Pod [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/trak.in\/stories\/indias-1st-pod-taxi-project-starts-at-bkc-mumbai-with-rs-1000-cr-budget\/\" \/>\n<meta property=\"og:site_name\" content=\"Trak.in - Indian Business of Tech, Mobile &amp; Startups\" \/>\n<meta property=\"article:published_time\" content=\"2026-04-08T03:44:49+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-08T03:45:06+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/trak.in\/stories\/wp-content\/uploads\/2026\/04\/Screenshot-2026-04-08-at-9.14.11-AM.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1268\" \/>\n\t<meta property=\"og:image:height\" content=\"850\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Mohul Ghosh\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Mohul Ghosh\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/trak.in\/stories\/indias-1st-pod-taxi-project-starts-at-bkc-mumbai-with-rs-1000-cr-budget\/\",\"url\":\"https:\/\/trak.in\/stories\/indias-1st-pod-taxi-project-starts-at-bkc-mumbai-with-rs-1000-cr-budget\/\",\"name\":\"India's 1st Pod Taxi Project Starts At BKC, Mumbai With Rs 1000 Cr Budget - Trak.in - Indian Business of Tech, Mobile &amp; Startups\",\"isPartOf\":{\"@id\":\"https:\/\/trak.in\/stories\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/trak.in\/stories\/indias-1st-pod-taxi-project-starts-at-bkc-mumbai-with-rs-1000-cr-budget\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/trak.in\/stories\/indias-1st-pod-taxi-project-starts-at-bkc-mumbai-with-rs-1000-cr-budget\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/trak.in\/stories\/wp-content\/uploads\/2026\/04\/Screenshot-2026-04-08-at-9.14.11-AM.png\",\"datePublished\":\"2026-04-08T03:44:49+00:00\",\"dateModified\":\"2026-04-08T03:45:06+00:00\",\"author\":{\"@id\":\"https:\/\/trak.in\/stories\/#\/schema\/person\/5092a7d2906e3f3c819643435477c2a7\"},\"breadcrumb\":{\"@id\":\"https:\/\/trak.in\/stories\/indias-1st-pod-taxi-project-starts-at-bkc-mumbai-with-rs-1000-cr-budget\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/trak.in\/stories\/indias-1st-pod-taxi-project-starts-at-bkc-mumbai-with-rs-1000-cr-budget\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/trak.in\/stories\/indias-1st-pod-taxi-project-starts-at-bkc-mumbai-with-rs-1000-cr-budget\/#primaryimage\",\"url\":\"https:\/\/trak.in\/stories\/wp-content\/uploads\/2026\/04\/Screenshot-2026-04-08-at-9.14.11-AM.png\",\"contentUrl\":\"https:\/\/trak.in\/stories\/wp-content\/uploads\/2026\/04\/Screenshot-2026-04-08-at-9.14.11-AM.png\",\"width\":1268,\"height\":850},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/trak.in\/stories\/indias-1st-pod-taxi-project-starts-at-bkc-mumbai-with-rs-1000-cr-budget\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/trak.in\/stories\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"India&#8217;s 1st Pod Taxi Project Starts At BKC, Mumbai With Rs 1000 Cr Budget\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/trak.in\/stories\/#website\",\"url\":\"https:\/\/trak.in\/stories\/\",\"name\":\"Trak.in - Indian Business of Tech, Mobile &amp; Startups\",\"description\":\"Trak.in is a popular Indian Business, Technology, Mobile &amp; Startup blog featuring trending News, views and analytical take on Technology, Business, Finance, Telecom, Mobile, startups &amp; Social Media Space\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/trak.in\/stories\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/trak.in\/stories\/#\/schema\/person\/5092a7d2906e3f3c819643435477c2a7\",\"name\":\"Mohul Ghosh\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/trak.in\/stories\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/66c129d83dd3f325a3b550eb1aa16891173ddfc4686361424206cd9a01311c89?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/66c129d83dd3f325a3b550eb1aa16891173ddfc4686361424206cd9a01311c89?s=96&d=mm&r=g\",\"caption\":\"Mohul Ghosh\"},\"url\":\"https:\/\/trak.in\/stories\/author\/mohul-ghosh\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"India's 1st Pod Taxi Project Starts At BKC, Mumbai With Rs 1000 Cr Budget - Trak.in - Indian Business of Tech, Mobile &amp; Startups","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/trak.in\/stories\/indias-1st-pod-taxi-project-starts-at-bkc-mumbai-with-rs-1000-cr-budget\/","og_locale":"en_US","og_type":"article","og_title":"India's 1st Pod Taxi Project Starts At BKC, Mumbai With Rs 1000 Cr Budget - Trak.in - Indian Business of Tech, Mobile &amp; Startups","og_description":"Mumbai has taken a major step toward futuristic urban mobility, with the groundbreaking (e-bhoomipujan) of India\u2019s first pod taxi project held at Bandra-Kurla Complex (BKC). The project marks the beginning of a driverless, on-demand transport system aimed at solving last-mile connectivity issues in one of the city\u2019s busiest business districts. What Is the BKC Pod [&hellip;]","og_url":"https:\/\/trak.in\/stories\/indias-1st-pod-taxi-project-starts-at-bkc-mumbai-with-rs-1000-cr-budget\/","og_site_name":"Trak.in - Indian Business of Tech, Mobile &amp; Startups","article_published_time":"2026-04-08T03:44:49+00:00","article_modified_time":"2026-04-08T03:45:06+00:00","og_image":[{"width":1268,"height":850,"url":"https:\/\/trak.in\/stories\/wp-content\/uploads\/2026\/04\/Screenshot-2026-04-08-at-9.14.11-AM.png","type":"image\/png"}],"author":"Mohul Ghosh","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Mohul Ghosh","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/trak.in\/stories\/indias-1st-pod-taxi-project-starts-at-bkc-mumbai-with-rs-1000-cr-budget\/","url":"https:\/\/trak.in\/stories\/indias-1st-pod-taxi-project-starts-at-bkc-mumbai-with-rs-1000-cr-budget\/","name":"India's 1st Pod Taxi Project Starts At BKC, Mumbai With Rs 1000 Cr Budget - Trak.in - Indian Business of Tech, Mobile &amp; Startups","isPartOf":{"@id":"https:\/\/trak.in\/stories\/#website"},"primaryImageOfPage":{"@id":"https:\/\/trak.in\/stories\/indias-1st-pod-taxi-project-starts-at-bkc-mumbai-with-rs-1000-cr-budget\/#primaryimage"},"image":{"@id":"https:\/\/trak.in\/stories\/indias-1st-pod-taxi-project-starts-at-bkc-mumbai-with-rs-1000-cr-budget\/#primaryimage"},"thumbnailUrl":"https:\/\/trak.in\/stories\/wp-content\/uploads\/2026\/04\/Screenshot-2026-04-08-at-9.14.11-AM.png","datePublished":"2026-04-08T03:44:49+00:00","dateModified":"2026-04-08T03:45:06+00:00","author":{"@id":"https:\/\/trak.in\/stories\/#\/schema\/person\/5092a7d2906e3f3c819643435477c2a7"},"breadcrumb":{"@id":"https:\/\/trak.in\/stories\/indias-1st-pod-taxi-project-starts-at-bkc-mumbai-with-rs-1000-cr-budget\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/trak.in\/stories\/indias-1st-pod-taxi-project-starts-at-bkc-mumbai-with-rs-1000-cr-budget\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/trak.in\/stories\/indias-1st-pod-taxi-project-starts-at-bkc-mumbai-with-rs-1000-cr-budget\/#primaryimage","url":"https:\/\/trak.in\/stories\/wp-content\/uploads\/2026\/04\/Screenshot-2026-04-08-at-9.14.11-AM.png","contentUrl":"https:\/\/trak.in\/stories\/wp-content\/uploads\/2026\/04\/Screenshot-2026-04-08-at-9.14.11-AM.png","width":1268,"height":850},{"@type":"BreadcrumbList","@id":"https:\/\/trak.in\/stories\/indias-1st-pod-taxi-project-starts-at-bkc-mumbai-with-rs-1000-cr-budget\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/trak.in\/stories\/"},{"@type":"ListItem","position":2,"name":"India&#8217;s 1st Pod Taxi Project Starts At BKC, Mumbai With Rs 1000 Cr Budget"}]},{"@type":"WebSite","@id":"https:\/\/trak.in\/stories\/#website","url":"https:\/\/trak.in\/stories\/","name":"Trak.in - Indian Business of Tech, Mobile &amp; Startups","description":"Trak.in is a popular Indian Business, Technology, Mobile &amp; Startup blog featuring trending News, views and analytical take on Technology, Business, Finance, Telecom, Mobile, startups &amp; Social Media Space","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/trak.in\/stories\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/trak.in\/stories\/#\/schema\/person\/5092a7d2906e3f3c819643435477c2a7","name":"Mohul Ghosh","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/trak.in\/stories\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/66c129d83dd3f325a3b550eb1aa16891173ddfc4686361424206cd9a01311c89?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/66c129d83dd3f325a3b550eb1aa16891173ddfc4686361424206cd9a01311c89?s=96&d=mm&r=g","caption":"Mohul Ghosh"},"url":"https:\/\/trak.in\/stories\/author\/mohul-ghosh\/"}]}},"jetpack_featured_media_url":"https:\/\/trak.in\/stories\/wp-content\/uploads\/2026\/04\/Screenshot-2026-04-08-at-9.14.11-AM.png","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/posts\/1308120","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/users\/30"}],"replies":[{"embeddable":true,"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/comments?post=1308120"}],"version-history":[{"count":1,"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/posts\/1308120\/revisions"}],"predecessor-version":[{"id":1308126,"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/posts\/1308120\/revisions\/1308126"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/media\/1308125"}],"wp:attachment":[{"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/media?parent=1308120"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/categories?post=1308120"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/tags?post=1308120"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}