{"id":1295387,"date":"2025-05-25T16:21:30","date_gmt":"2025-05-25T10:51:30","guid":{"rendered":"https:\/\/trak.in\/stories\/?p=1295387"},"modified":"2025-05-25T16:22:04","modified_gmt":"2025-05-25T10:52:04","slug":"noida-gurgaon-to-be-connected-with-new-train-running-at-180-kmph-speed","status":"publish","type":"post","link":"https:\/\/trak.in\/stories\/noida-gurgaon-to-be-connected-with-new-train-running-at-180-kmph-speed\/","title":{"rendered":"Noida &#8211; Gurgaon To Be Connected With New Train Running At 180 Kmph Speed"},"content":{"rendered":"\n<p>The National Capital Region Transport Corporation Limited (NCRTC) has proposed a new 60-kilometre-long <strong>Namo Bharat train route<\/strong> connecting <strong>Gurugram, Faridabad, and Greater Noida.<\/strong> This high-speed corridor, designed to run trains at speeds of up to <strong>180 km\/hr<\/strong> (with an operational minimum of <strong>160 km\/hr<\/strong>), aims to significantly boost regional connectivity. The plan, currently awaiting approval from the <strong>Haryana Mass Rapid Transport Corporation (HMRTC)<\/strong>, includes <strong>six stations<\/strong>along the route. These are proposed at <strong>IFFCO Chowk (Sector-29)<\/strong> on the Delhi-Jaipur Highway, <strong>Sector-54<\/strong> on Golf Course Road in Gurugram, <strong>Bata Chowk<\/strong> and near <strong>Sector 85-86<\/strong> in Faridabad, between <strong>Noida Sectors 142-168<\/strong>, and <strong>Surajpur<\/strong> in Greater Noida. Once approved, a <strong>Detailed Project Report (DPR)<\/strong> will be prepared.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"573\" src=\"https:\/\/trak.in\/stories\/wp-content\/uploads\/2025\/05\/Screenshot-2024-09-17-at-10.05.31\u202fAM-1024x573.png\" alt=\"\" class=\"wp-image-1295493\" srcset=\"https:\/\/trak.in\/stories\/wp-content\/uploads\/2025\/05\/Screenshot-2024-09-17-at-10.05.31\u202fAM-1024x573.png 1024w, https:\/\/trak.in\/stories\/wp-content\/uploads\/2025\/05\/Screenshot-2024-09-17-at-10.05.31\u202fAM-300x168.png 300w, https:\/\/trak.in\/stories\/wp-content\/uploads\/2025\/05\/Screenshot-2024-09-17-at-10.05.31\u202fAM-768x430.png 768w, https:\/\/trak.in\/stories\/wp-content\/uploads\/2025\/05\/Screenshot-2024-09-17-at-10.05.31\u202fAM.png 1536w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p><strong>Namo Bharat Train Route: Gurugram to Greater Noida Connectivity Plan<\/strong><\/p>\n\n\n\n<p>The Namo Bharat train will start at IFFCO Chowk and travel along Dr. B.R. Ambedkar Marg, Brigadier Usman Chowk, and AIT Chowk on Golf Course Road. It will then move through Ghata Chowk and Gwal Pahari Chowk before entering the <strong>Gurugram-Faridabad Road<\/strong>, covering about <strong>18.4 km<\/strong> to reach <strong>NIT Faridabad<\/strong> via Shaheed Bhagat Singh Marg. After crossing the <strong>Vishwakarma Setu<\/strong> and <strong>Palwal railway line<\/strong>, the route reaches <strong>Bata Chowk<\/strong>, then continues via the road between <strong>Sectors 85 and 86<\/strong>. It will cross the <strong>FNG Road<\/strong> and the <strong>Yamuna River<\/strong> to enter <strong>Noida<\/strong>, passing near <strong>Sector 142 metro station<\/strong>, along <strong>Gurjar Road<\/strong> and <strong>Hindon<\/strong>, before reaching <strong>Kuleshra<\/strong>, and then moving through <strong>Hebatpur<\/strong>and <strong>Dadri Main Road<\/strong>to terminate at <strong>Surajpur<\/strong>, near <strong>Yamuna Junction<\/strong> in Greater Noida.<\/p>\n\n\n\n<p>The project is expected to cost approximately <strong>\u20b915,000 crore<\/strong> and is planned to offer a train every <strong>five to seven minutes<\/strong>, ensuring high-frequency service. The corridor will also integrate with the <strong>Ghaziabad\u2013Jewar Airport Namo Bharat Corridor<\/strong>, further strengthening the regional rapid transit network.<\/p>\n\n\n\n<p><strong>Summary:<\/strong><\/p>\n\n\n\n<p>The NCRTC has proposed a 60-km Namo Bharat train route connecting Gurugram, Faridabad, and Greater Noida, featuring six stations. Designed for speeds up to 180 km\/hr, it aims to enhance regional connectivity. Pending HMRTC approval, the \u20b915,000 crore project will offer trains every 5-7 minutes and link with the Jewar Airport corridor.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The National Capital Region Transport Corporation Limited (NCRTC) has proposed a new 60-kilometre-long Namo Bharat train route connecting Gurugram, Faridabad, and Greater Noida. This high-speed corridor, designed to run trains at speeds of up to 180 km\/hr (with an operational minimum of 160 km\/hr), aims to significantly boost regional connectivity. The plan, currently awaiting approval [&hellip;]<\/p>\n","protected":false},"author":26,"featured_media":1295493,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[21],"tags":[6115],"class_list":["post-1295387","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-business","tag-namo-bharat"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.9 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Noida - Gurgaon To Be Connected With New Train Running At 180 Kmph Speed - Trak.in - Indian Business of Tech, Mobile &amp; Startups<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/trak.in\/stories\/noida-gurgaon-to-be-connected-with-new-train-running-at-180-kmph-speed\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Noida - Gurgaon To Be Connected With New Train Running At 180 Kmph Speed - Trak.in - Indian Business of Tech, Mobile &amp; Startups\" \/>\n<meta property=\"og:description\" content=\"The National Capital Region Transport Corporation Limited (NCRTC) has proposed a new 60-kilometre-long Namo Bharat train route connecting Gurugram, Faridabad, and Greater Noida. This high-speed corridor, designed to run trains at speeds of up to 180 km\/hr (with an operational minimum of 160 km\/hr), aims to significantly boost regional connectivity. The plan, currently awaiting approval [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/trak.in\/stories\/noida-gurgaon-to-be-connected-with-new-train-running-at-180-kmph-speed\/\" \/>\n<meta property=\"og:site_name\" content=\"Trak.in - Indian Business of Tech, Mobile &amp; Startups\" \/>\n<meta property=\"article:published_time\" content=\"2025-05-25T10:51:30+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-05-25T10:52:04+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/trak.in\/stories\/wp-content\/uploads\/2025\/05\/Screenshot-2024-09-17-at-10.05.31\u202fAM.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t<meta property=\"og:image:height\" content=\"860\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Rohit Kulkarni\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Rohit Kulkarni\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/trak.in\/stories\/noida-gurgaon-to-be-connected-with-new-train-running-at-180-kmph-speed\/\",\"url\":\"https:\/\/trak.in\/stories\/noida-gurgaon-to-be-connected-with-new-train-running-at-180-kmph-speed\/\",\"name\":\"Noida - Gurgaon To Be Connected With New Train Running At 180 Kmph Speed - Trak.in - Indian Business of Tech, Mobile &amp; Startups\",\"isPartOf\":{\"@id\":\"https:\/\/trak.in\/stories\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/trak.in\/stories\/noida-gurgaon-to-be-connected-with-new-train-running-at-180-kmph-speed\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/trak.in\/stories\/noida-gurgaon-to-be-connected-with-new-train-running-at-180-kmph-speed\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/trak.in\/stories\/wp-content\/uploads\/2025\/05\/Screenshot-2024-09-17-at-10.05.31\u202fAM.png\",\"datePublished\":\"2025-05-25T10:51:30+00:00\",\"dateModified\":\"2025-05-25T10:52:04+00:00\",\"author\":{\"@id\":\"https:\/\/trak.in\/stories\/#\/schema\/person\/4486219a5d31e657b529e6e874cead8b\"},\"breadcrumb\":{\"@id\":\"https:\/\/trak.in\/stories\/noida-gurgaon-to-be-connected-with-new-train-running-at-180-kmph-speed\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/trak.in\/stories\/noida-gurgaon-to-be-connected-with-new-train-running-at-180-kmph-speed\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/trak.in\/stories\/noida-gurgaon-to-be-connected-with-new-train-running-at-180-kmph-speed\/#primaryimage\",\"url\":\"https:\/\/trak.in\/stories\/wp-content\/uploads\/2025\/05\/Screenshot-2024-09-17-at-10.05.31\u202fAM.png\",\"contentUrl\":\"https:\/\/trak.in\/stories\/wp-content\/uploads\/2025\/05\/Screenshot-2024-09-17-at-10.05.31\u202fAM.png\",\"width\":1536,\"height\":860},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/trak.in\/stories\/noida-gurgaon-to-be-connected-with-new-train-running-at-180-kmph-speed\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/trak.in\/stories\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Noida &#8211; Gurgaon To Be Connected With New Train Running At 180 Kmph Speed\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/trak.in\/stories\/#website\",\"url\":\"https:\/\/trak.in\/stories\/\",\"name\":\"Trak.in - Indian Business of Tech, Mobile &amp; Startups\",\"description\":\"Trak.in is a popular Indian Business, Technology, Mobile &amp; Startup blog featuring trending News, views and analytical take on Technology, Business, Finance, Telecom, Mobile, startups &amp; Social Media Space\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/trak.in\/stories\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/trak.in\/stories\/#\/schema\/person\/4486219a5d31e657b529e6e874cead8b\",\"name\":\"Rohit Kulkarni\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/trak.in\/stories\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/52ba60e3a61a3517cad7b5dd6bce76c6e7a4d8b337f4240839e8737c4ab8b1bb?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/52ba60e3a61a3517cad7b5dd6bce76c6e7a4d8b337f4240839e8737c4ab8b1bb?s=96&d=mm&r=g\",\"caption\":\"Rohit Kulkarni\"},\"url\":\"https:\/\/trak.in\/stories\/author\/rohit-kulkarni\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Noida - Gurgaon To Be Connected With New Train Running At 180 Kmph Speed - Trak.in - Indian Business of Tech, Mobile &amp; Startups","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/trak.in\/stories\/noida-gurgaon-to-be-connected-with-new-train-running-at-180-kmph-speed\/","og_locale":"en_US","og_type":"article","og_title":"Noida - Gurgaon To Be Connected With New Train Running At 180 Kmph Speed - Trak.in - Indian Business of Tech, Mobile &amp; Startups","og_description":"The National Capital Region Transport Corporation Limited (NCRTC) has proposed a new 60-kilometre-long Namo Bharat train route connecting Gurugram, Faridabad, and Greater Noida. This high-speed corridor, designed to run trains at speeds of up to 180 km\/hr (with an operational minimum of 160 km\/hr), aims to significantly boost regional connectivity. The plan, currently awaiting approval [&hellip;]","og_url":"https:\/\/trak.in\/stories\/noida-gurgaon-to-be-connected-with-new-train-running-at-180-kmph-speed\/","og_site_name":"Trak.in - Indian Business of Tech, Mobile &amp; Startups","article_published_time":"2025-05-25T10:51:30+00:00","article_modified_time":"2025-05-25T10:52:04+00:00","og_image":[{"width":1536,"height":860,"url":"https:\/\/trak.in\/stories\/wp-content\/uploads\/2025\/05\/Screenshot-2024-09-17-at-10.05.31\u202fAM.png","type":"image\/png"}],"author":"Rohit Kulkarni","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Rohit Kulkarni","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/trak.in\/stories\/noida-gurgaon-to-be-connected-with-new-train-running-at-180-kmph-speed\/","url":"https:\/\/trak.in\/stories\/noida-gurgaon-to-be-connected-with-new-train-running-at-180-kmph-speed\/","name":"Noida - Gurgaon To Be Connected With New Train Running At 180 Kmph Speed - Trak.in - Indian Business of Tech, Mobile &amp; Startups","isPartOf":{"@id":"https:\/\/trak.in\/stories\/#website"},"primaryImageOfPage":{"@id":"https:\/\/trak.in\/stories\/noida-gurgaon-to-be-connected-with-new-train-running-at-180-kmph-speed\/#primaryimage"},"image":{"@id":"https:\/\/trak.in\/stories\/noida-gurgaon-to-be-connected-with-new-train-running-at-180-kmph-speed\/#primaryimage"},"thumbnailUrl":"https:\/\/trak.in\/stories\/wp-content\/uploads\/2025\/05\/Screenshot-2024-09-17-at-10.05.31\u202fAM.png","datePublished":"2025-05-25T10:51:30+00:00","dateModified":"2025-05-25T10:52:04+00:00","author":{"@id":"https:\/\/trak.in\/stories\/#\/schema\/person\/4486219a5d31e657b529e6e874cead8b"},"breadcrumb":{"@id":"https:\/\/trak.in\/stories\/noida-gurgaon-to-be-connected-with-new-train-running-at-180-kmph-speed\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/trak.in\/stories\/noida-gurgaon-to-be-connected-with-new-train-running-at-180-kmph-speed\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/trak.in\/stories\/noida-gurgaon-to-be-connected-with-new-train-running-at-180-kmph-speed\/#primaryimage","url":"https:\/\/trak.in\/stories\/wp-content\/uploads\/2025\/05\/Screenshot-2024-09-17-at-10.05.31\u202fAM.png","contentUrl":"https:\/\/trak.in\/stories\/wp-content\/uploads\/2025\/05\/Screenshot-2024-09-17-at-10.05.31\u202fAM.png","width":1536,"height":860},{"@type":"BreadcrumbList","@id":"https:\/\/trak.in\/stories\/noida-gurgaon-to-be-connected-with-new-train-running-at-180-kmph-speed\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/trak.in\/stories\/"},{"@type":"ListItem","position":2,"name":"Noida &#8211; Gurgaon To Be Connected With New Train Running At 180 Kmph Speed"}]},{"@type":"WebSite","@id":"https:\/\/trak.in\/stories\/#website","url":"https:\/\/trak.in\/stories\/","name":"Trak.in - Indian Business of Tech, Mobile &amp; Startups","description":"Trak.in is a popular Indian Business, Technology, Mobile &amp; Startup blog featuring trending News, views and analytical take on Technology, Business, Finance, Telecom, Mobile, startups &amp; Social Media Space","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/trak.in\/stories\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/trak.in\/stories\/#\/schema\/person\/4486219a5d31e657b529e6e874cead8b","name":"Rohit Kulkarni","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/trak.in\/stories\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/52ba60e3a61a3517cad7b5dd6bce76c6e7a4d8b337f4240839e8737c4ab8b1bb?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/52ba60e3a61a3517cad7b5dd6bce76c6e7a4d8b337f4240839e8737c4ab8b1bb?s=96&d=mm&r=g","caption":"Rohit Kulkarni"},"url":"https:\/\/trak.in\/stories\/author\/rohit-kulkarni\/"}]}},"jetpack_featured_media_url":"https:\/\/trak.in\/stories\/wp-content\/uploads\/2025\/05\/Screenshot-2024-09-17-at-10.05.31\u202fAM.png","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/posts\/1295387","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/users\/26"}],"replies":[{"embeddable":true,"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/comments?post=1295387"}],"version-history":[{"count":2,"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/posts\/1295387\/revisions"}],"predecessor-version":[{"id":1295494,"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/posts\/1295387\/revisions\/1295494"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/media\/1295493"}],"wp:attachment":[{"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/media?parent=1295387"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/categories?post=1295387"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/tags?post=1295387"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}