{"id":1291241,"date":"2025-03-03T09:16:22","date_gmt":"2025-03-03T03:46:22","guid":{"rendered":"https:\/\/trak.in\/stories\/?p=1291241"},"modified":"2025-03-03T09:19:30","modified_gmt":"2025-03-03T03:49:30","slug":"only-46-passengers-service-reported-on-mumbai-metro-3-between-ocobert-to-february","status":"publish","type":"post","link":"https:\/\/trak.in\/stories\/only-46-passengers-service-reported-on-mumbai-metro-3-between-ocobert-to-february\/","title":{"rendered":"Only 46 Passengers\/Service Reported On Mumbai Metro 3 Between Ocobert To February"},"content":{"rendered":"\n<p>Mumbai\u2019s Aqua Line (Metro 3), the city\u2019s only underground metro corridor connecting Bandra Kurla Complex (BKC) to Aarey Colony, has faced disappointing ridership since its partial launch on October 7, 2024. From October 7, 2024, to February 20, 2025, the metro saw just 2.66 million passengers, which translates to an average of fewer than 20,000 passengers daily. This is a stark contrast to the projected daily ridership of 400,000, reflecting a significant shortfall in passenger numbers.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/trak.in\/stories\/wp-content\/uploads\/2025\/03\/Metro_Line_3_Rake_at_Aarey_Metro_Station-1024x576.jpg\" alt=\"\" class=\"wp-image-1291510\" srcset=\"https:\/\/trak.in\/stories\/wp-content\/uploads\/2025\/03\/Metro_Line_3_Rake_at_Aarey_Metro_Station-1024x576.jpg 1024w, https:\/\/trak.in\/stories\/wp-content\/uploads\/2025\/03\/Metro_Line_3_Rake_at_Aarey_Metro_Station-300x169.jpg 300w, https:\/\/trak.in\/stories\/wp-content\/uploads\/2025\/03\/Metro_Line_3_Rake_at_Aarey_Metro_Station-768x432.jpg 768w, https:\/\/trak.in\/stories\/wp-content\/uploads\/2025\/03\/Metro_Line_3_Rake_at_Aarey_Metro_Station-1536x864.jpg 1536w, https:\/\/trak.in\/stories\/wp-content\/uploads\/2025\/03\/Metro_Line_3_Rake_at_Aarey_Metro_Station-2048x1153.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p><strong>Aqua Line Struggles with Low Ridership After Launch<\/strong><\/p>\n\n\n\n<p>Inaugurated on October 5, 2024, the Aqua Line was expected to become a <a href=\"https:\/\/www.freepressjournal.in\/amp\/mumbai\/mumbai-metro-3-struggles-with-ridership-only-46-passengers-travel-per-service-says-report\">crucial transport link in Mumbai.<\/a> However, the Mumbai Metro Rail Corporation (MMRC) reported that, over 136 days, the 12.44 km stretch between Aarey and BKC registered only 29,162 trips (58,324 one-way services). With an average of just 91 passengers per trip, the metro is operating well below its capacity. Despite each train having the capacity for 2,500 passengers, ridership remains low due to the limited number of trains\u2014only nine, running at a 7.5-minute frequency.<\/p>\n\n\n\n<p>The service operates from 6:30 am to 10:30 pm on weekdays and from 8:30 am to 10:30 pm on weekends. While there is an uptick in ridership during rush hours, passenger numbers are sparse throughout the day. MMRC officials attributed the low turnout to the partial operation of the corridor and are hopeful that ridership will increase once the entire corridor is operational by June 2025.<\/p>\n\n\n\n<p><strong>Optimism for Aqua Line\u2019s Future as Next Section Nears Completion<\/strong><\/p>\n\n\n\n<p>The Aqua Line is part of the 33.5 km Aarey\u2013BKC\u2013Cuffe Parade corridor, being completed in phases. The next section, extending to Acharya Atre Chowk, is expected to open soon. Despite the low ridership, the MMRC highlights the metro&#8217;s punctuality rate of 99.60%, and it remains optimistic about improving connectivity and boosting passenger numbers in the future.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Mumbai\u2019s Aqua Line (Metro 3), the city\u2019s only underground metro corridor connecting Bandra Kurla Complex (BKC) to Aarey Colony, has faced disappointing ridership since its partial launch on October 7, 2024. From October 7, 2024, to February 20, 2025, the metro saw just 2.66 million passengers, which translates to an average of fewer than 20,000 [&hellip;]<\/p>\n","protected":false},"author":26,"featured_media":1291510,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[21],"tags":[854,7201],"class_list":["post-1291241","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-business","tag-mumbai","tag-mumbai-metro-3"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.9 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Only 46 Passengers\/Service Reported On Mumbai Metro 3 Between Ocobert To February - Trak.in - Indian Business of Tech, Mobile &amp; Startups<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/trak.in\/stories\/only-46-passengers-service-reported-on-mumbai-metro-3-between-ocobert-to-february\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Only 46 Passengers\/Service Reported On Mumbai Metro 3 Between Ocobert To February - Trak.in - Indian Business of Tech, Mobile &amp; Startups\" \/>\n<meta property=\"og:description\" content=\"Mumbai\u2019s Aqua Line (Metro 3), the city\u2019s only underground metro corridor connecting Bandra Kurla Complex (BKC) to Aarey Colony, has faced disappointing ridership since its partial launch on October 7, 2024. From October 7, 2024, to February 20, 2025, the metro saw just 2.66 million passengers, which translates to an average of fewer than 20,000 [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/trak.in\/stories\/only-46-passengers-service-reported-on-mumbai-metro-3-between-ocobert-to-february\/\" \/>\n<meta property=\"og:site_name\" content=\"Trak.in - Indian Business of Tech, Mobile &amp; Startups\" \/>\n<meta property=\"article:published_time\" content=\"2025-03-03T03:46:22+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-03-03T03:49:30+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/trak.in\/stories\/wp-content\/uploads\/2025\/03\/Metro_Line_3_Rake_at_Aarey_Metro_Station-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1441\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Rohit Kulkarni\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Rohit Kulkarni\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/trak.in\/stories\/only-46-passengers-service-reported-on-mumbai-metro-3-between-ocobert-to-february\/\",\"url\":\"https:\/\/trak.in\/stories\/only-46-passengers-service-reported-on-mumbai-metro-3-between-ocobert-to-february\/\",\"name\":\"Only 46 Passengers\/Service Reported On Mumbai Metro 3 Between Ocobert To February - Trak.in - Indian Business of Tech, Mobile &amp; Startups\",\"isPartOf\":{\"@id\":\"https:\/\/trak.in\/stories\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/trak.in\/stories\/only-46-passengers-service-reported-on-mumbai-metro-3-between-ocobert-to-february\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/trak.in\/stories\/only-46-passengers-service-reported-on-mumbai-metro-3-between-ocobert-to-february\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/trak.in\/stories\/wp-content\/uploads\/2025\/03\/Metro_Line_3_Rake_at_Aarey_Metro_Station-scaled.jpg\",\"datePublished\":\"2025-03-03T03:46:22+00:00\",\"dateModified\":\"2025-03-03T03:49:30+00:00\",\"author\":{\"@id\":\"https:\/\/trak.in\/stories\/#\/schema\/person\/4486219a5d31e657b529e6e874cead8b\"},\"breadcrumb\":{\"@id\":\"https:\/\/trak.in\/stories\/only-46-passengers-service-reported-on-mumbai-metro-3-between-ocobert-to-february\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/trak.in\/stories\/only-46-passengers-service-reported-on-mumbai-metro-3-between-ocobert-to-february\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/trak.in\/stories\/only-46-passengers-service-reported-on-mumbai-metro-3-between-ocobert-to-february\/#primaryimage\",\"url\":\"https:\/\/trak.in\/stories\/wp-content\/uploads\/2025\/03\/Metro_Line_3_Rake_at_Aarey_Metro_Station-scaled.jpg\",\"contentUrl\":\"https:\/\/trak.in\/stories\/wp-content\/uploads\/2025\/03\/Metro_Line_3_Rake_at_Aarey_Metro_Station-scaled.jpg\",\"width\":2560,\"height\":1441},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/trak.in\/stories\/only-46-passengers-service-reported-on-mumbai-metro-3-between-ocobert-to-february\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/trak.in\/stories\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Only 46 Passengers\/Service Reported On Mumbai Metro 3 Between Ocobert To February\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/trak.in\/stories\/#website\",\"url\":\"https:\/\/trak.in\/stories\/\",\"name\":\"Trak.in - Indian Business of Tech, Mobile &amp; Startups\",\"description\":\"Trak.in is a popular Indian Business, Technology, Mobile &amp; Startup blog featuring trending News, views and analytical take on Technology, Business, Finance, Telecom, Mobile, startups &amp; Social Media Space\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/trak.in\/stories\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/trak.in\/stories\/#\/schema\/person\/4486219a5d31e657b529e6e874cead8b\",\"name\":\"Rohit Kulkarni\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/trak.in\/stories\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/52ba60e3a61a3517cad7b5dd6bce76c6e7a4d8b337f4240839e8737c4ab8b1bb?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/52ba60e3a61a3517cad7b5dd6bce76c6e7a4d8b337f4240839e8737c4ab8b1bb?s=96&d=mm&r=g\",\"caption\":\"Rohit Kulkarni\"},\"url\":\"https:\/\/trak.in\/stories\/author\/rohit-kulkarni\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Only 46 Passengers\/Service Reported On Mumbai Metro 3 Between Ocobert To February - Trak.in - Indian Business of Tech, Mobile &amp; Startups","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/trak.in\/stories\/only-46-passengers-service-reported-on-mumbai-metro-3-between-ocobert-to-february\/","og_locale":"en_US","og_type":"article","og_title":"Only 46 Passengers\/Service Reported On Mumbai Metro 3 Between Ocobert To February - Trak.in - Indian Business of Tech, Mobile &amp; Startups","og_description":"Mumbai\u2019s Aqua Line (Metro 3), the city\u2019s only underground metro corridor connecting Bandra Kurla Complex (BKC) to Aarey Colony, has faced disappointing ridership since its partial launch on October 7, 2024. From October 7, 2024, to February 20, 2025, the metro saw just 2.66 million passengers, which translates to an average of fewer than 20,000 [&hellip;]","og_url":"https:\/\/trak.in\/stories\/only-46-passengers-service-reported-on-mumbai-metro-3-between-ocobert-to-february\/","og_site_name":"Trak.in - Indian Business of Tech, Mobile &amp; Startups","article_published_time":"2025-03-03T03:46:22+00:00","article_modified_time":"2025-03-03T03:49:30+00:00","og_image":[{"width":2560,"height":1441,"url":"https:\/\/trak.in\/stories\/wp-content\/uploads\/2025\/03\/Metro_Line_3_Rake_at_Aarey_Metro_Station-scaled.jpg","type":"image\/jpeg"}],"author":"Rohit Kulkarni","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Rohit Kulkarni","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/trak.in\/stories\/only-46-passengers-service-reported-on-mumbai-metro-3-between-ocobert-to-february\/","url":"https:\/\/trak.in\/stories\/only-46-passengers-service-reported-on-mumbai-metro-3-between-ocobert-to-february\/","name":"Only 46 Passengers\/Service Reported On Mumbai Metro 3 Between Ocobert To February - Trak.in - Indian Business of Tech, Mobile &amp; Startups","isPartOf":{"@id":"https:\/\/trak.in\/stories\/#website"},"primaryImageOfPage":{"@id":"https:\/\/trak.in\/stories\/only-46-passengers-service-reported-on-mumbai-metro-3-between-ocobert-to-february\/#primaryimage"},"image":{"@id":"https:\/\/trak.in\/stories\/only-46-passengers-service-reported-on-mumbai-metro-3-between-ocobert-to-february\/#primaryimage"},"thumbnailUrl":"https:\/\/trak.in\/stories\/wp-content\/uploads\/2025\/03\/Metro_Line_3_Rake_at_Aarey_Metro_Station-scaled.jpg","datePublished":"2025-03-03T03:46:22+00:00","dateModified":"2025-03-03T03:49:30+00:00","author":{"@id":"https:\/\/trak.in\/stories\/#\/schema\/person\/4486219a5d31e657b529e6e874cead8b"},"breadcrumb":{"@id":"https:\/\/trak.in\/stories\/only-46-passengers-service-reported-on-mumbai-metro-3-between-ocobert-to-february\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/trak.in\/stories\/only-46-passengers-service-reported-on-mumbai-metro-3-between-ocobert-to-february\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/trak.in\/stories\/only-46-passengers-service-reported-on-mumbai-metro-3-between-ocobert-to-february\/#primaryimage","url":"https:\/\/trak.in\/stories\/wp-content\/uploads\/2025\/03\/Metro_Line_3_Rake_at_Aarey_Metro_Station-scaled.jpg","contentUrl":"https:\/\/trak.in\/stories\/wp-content\/uploads\/2025\/03\/Metro_Line_3_Rake_at_Aarey_Metro_Station-scaled.jpg","width":2560,"height":1441},{"@type":"BreadcrumbList","@id":"https:\/\/trak.in\/stories\/only-46-passengers-service-reported-on-mumbai-metro-3-between-ocobert-to-february\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/trak.in\/stories\/"},{"@type":"ListItem","position":2,"name":"Only 46 Passengers\/Service Reported On Mumbai Metro 3 Between Ocobert To February"}]},{"@type":"WebSite","@id":"https:\/\/trak.in\/stories\/#website","url":"https:\/\/trak.in\/stories\/","name":"Trak.in - Indian Business of Tech, Mobile &amp; Startups","description":"Trak.in is a popular Indian Business, Technology, Mobile &amp; Startup blog featuring trending News, views and analytical take on Technology, Business, Finance, Telecom, Mobile, startups &amp; Social Media Space","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/trak.in\/stories\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/trak.in\/stories\/#\/schema\/person\/4486219a5d31e657b529e6e874cead8b","name":"Rohit Kulkarni","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/trak.in\/stories\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/52ba60e3a61a3517cad7b5dd6bce76c6e7a4d8b337f4240839e8737c4ab8b1bb?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/52ba60e3a61a3517cad7b5dd6bce76c6e7a4d8b337f4240839e8737c4ab8b1bb?s=96&d=mm&r=g","caption":"Rohit Kulkarni"},"url":"https:\/\/trak.in\/stories\/author\/rohit-kulkarni\/"}]}},"jetpack_featured_media_url":"https:\/\/trak.in\/stories\/wp-content\/uploads\/2025\/03\/Metro_Line_3_Rake_at_Aarey_Metro_Station-scaled.jpg","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/posts\/1291241","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/users\/26"}],"replies":[{"embeddable":true,"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/comments?post=1291241"}],"version-history":[{"count":3,"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/posts\/1291241\/revisions"}],"predecessor-version":[{"id":1291515,"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/posts\/1291241\/revisions\/1291515"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/media\/1291510"}],"wp:attachment":[{"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/media?parent=1291241"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/categories?post=1291241"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/tags?post=1291241"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}