{"id":1287228,"date":"2024-11-10T12:09:11","date_gmt":"2024-11-10T06:39:11","guid":{"rendered":"https:\/\/trak.in\/stories\/?p=1287228"},"modified":"2024-11-10T12:09:47","modified_gmt":"2024-11-10T06:39:47","slug":"indian-railways-making-indias-1st-dedicated-track-for-testing-at-rs-820-crore-expense","status":"publish","type":"post","link":"https:\/\/trak.in\/stories\/indian-railways-making-indias-1st-dedicated-track-for-testing-at-rs-820-crore-expense\/","title":{"rendered":"Indian Railways Making India&#8217;s 1st Dedicated Track For Testing At Rs 820 Crore Expense"},"content":{"rendered":"\n<p>India&#8217;s first dedicated railway test track is under construction in Rajasthan, aimed at providing a specialized facility for testing various types of rolling stock, from high-speed to metro trains. This 60 km track, developed by the Research Designs and Standards Organization (RDSO), features curves and loops to simulate real-world conditions. The track is projected to be completed by December 2025, with a total cost of Rs 820 crore.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"676\" src=\"https:\/\/trak.in\/stories\/wp-content\/uploads\/2024\/11\/Screenshot-2024-11-10-at-11.54.50\u202fAM-1-1024x676.png\" alt=\"Indian Railways Making India's 1st Dedicated Track For Testing At Rs 820 Crore Expense\" class=\"wp-image-1287231\" srcset=\"https:\/\/trak.in\/stories\/wp-content\/uploads\/2024\/11\/Screenshot-2024-11-10-at-11.54.50\u202fAM-1-1024x676.png 1024w, https:\/\/trak.in\/stories\/wp-content\/uploads\/2024\/11\/Screenshot-2024-11-10-at-11.54.50\u202fAM-1-300x198.png 300w, https:\/\/trak.in\/stories\/wp-content\/uploads\/2024\/11\/Screenshot-2024-11-10-at-11.54.50\u202fAM-1-768x507.png 768w, https:\/\/trak.in\/stories\/wp-content\/uploads\/2024\/11\/Screenshot-2024-11-10-at-11.54.50\u202fAM-1.png 1224w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p><strong>Design for Comprehensive Testing of Speed and Stability<\/strong><br>The test track has been constructed with both low- and high-speed curves, <a href=\"https:\/\/economictimes.indiatimes.com\/industry\/transportation\/railways\/indias-first-dedicated-railway-test-track-worth-rs-820-crore-getting-constructed-in-rajasthan\/articleshow\/115115530.cms?from=mdr\">enabling trials at varying speeds<\/a>. With this design, the track allows trains to maintain speed even on curved sections, essential for evaluating bullet trains and high-speed rolling stock, which can reach up to 230 kmph. The project involves constructing bridges and using innovative materials to withstand vibration, such as stainless steel and heavy RCC boxes to prevent rust in the alkaline Sambhar Lake environment.<\/p>\n\n\n\n<p><strong>High-Speed, Semi-High-Speed, and Metro Train Testing<\/strong><br>The track is built to support testing for various train categories, including high-speed, semi-high-speed, and metro trains. The main line spans 23 km, while additional loops facilitate specialized tests: a 13 km high-speed loop at Gudha, a 3 km rapid test loop at Nawa, and a 20 km curve testing loop at Mithadi. These features will enable comprehensive assessments of train stability, vibration levels, and safety under diverse conditions, including varying track surfaces.<\/p>\n\n\n\n<p><strong>Boost to Rail Safety and International Collaboration Potential<\/strong><br>This track addresses India\u2019s need for a dedicated testing line, reducing the need to alter schedules on existing lines. The RDSO will monitor testing, ensuring that trains meet safety standards before commercial deployment. The new facility not only promises increased efficiency in rail testing but also opens avenues for neighboring countries to test their trains on this track, potentially expanding India&#8217;s role in regional rail advancements.<\/p>\n\n\n\n<p><strong>Moving Toward Modern Railway Infrastructure<\/strong><br>The Rajasthan test track highlights Indian Railways&#8217; commitment to enhancing rail safety and operational efficiency. By December 2025, this dedicated testing ground is expected to set new benchmarks in high-speed rail technology, safety, and performance, laying the foundation for India\u2019s future in high-speed rail travel and modernizing its rail infrastructure.<\/p>\n\n\n\n<p><a href=\"https:\/\/timesofindia.indiatimes.com\/city\/jaipur\/indias-1st-high-speed-train-test-track-in-raj-by-2024\/articleshow\/93014712.cms\">Image Source<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>India&#8217;s first dedicated railway test track is under construction in Rajasthan, aimed at providing a specialized facility for testing various types of rolling stock, from high-speed to metro trains. This 60 km track, developed by the Research Designs and Standards Organization (RDSO), features curves and loops to simulate real-world conditions. The track is projected to [&hellip;]<\/p>\n","protected":false},"author":30,"featured_media":1287231,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[135],"tags":[6464,6466],"class_list":["post-1287228","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-indian-railways","tag-dedicated-track-for-testing","tag-indian-raiways"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.9 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Indian Railways Making India&#039;s 1st Dedicated Track For Testing At Rs 820 Crore Expense - Trak.in - Indian Business of Tech, Mobile &amp; Startups<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/trak.in\/stories\/indian-railways-making-indias-1st-dedicated-track-for-testing-at-rs-820-crore-expense\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Indian Railways Making India&#039;s 1st Dedicated Track For Testing At Rs 820 Crore Expense - Trak.in - Indian Business of Tech, Mobile &amp; Startups\" \/>\n<meta property=\"og:description\" content=\"India&#8217;s first dedicated railway test track is under construction in Rajasthan, aimed at providing a specialized facility for testing various types of rolling stock, from high-speed to metro trains. This 60 km track, developed by the Research Designs and Standards Organization (RDSO), features curves and loops to simulate real-world conditions. The track is projected to [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/trak.in\/stories\/indian-railways-making-indias-1st-dedicated-track-for-testing-at-rs-820-crore-expense\/\" \/>\n<meta property=\"og:site_name\" content=\"Trak.in - Indian Business of Tech, Mobile &amp; Startups\" \/>\n<meta property=\"article:published_time\" content=\"2024-11-10T06:39:11+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-11-10T06:39:47+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/trak.in\/stories\/wp-content\/uploads\/2024\/11\/Screenshot-2024-11-10-at-11.54.50\u202fAM-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1224\" \/>\n\t<meta property=\"og:image:height\" content=\"808\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Mohul Ghosh\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Mohul Ghosh\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/trak.in\/stories\/indian-railways-making-indias-1st-dedicated-track-for-testing-at-rs-820-crore-expense\/\",\"url\":\"https:\/\/trak.in\/stories\/indian-railways-making-indias-1st-dedicated-track-for-testing-at-rs-820-crore-expense\/\",\"name\":\"Indian Railways Making India's 1st Dedicated Track For Testing At Rs 820 Crore Expense - Trak.in - Indian Business of Tech, Mobile &amp; Startups\",\"isPartOf\":{\"@id\":\"https:\/\/trak.in\/stories\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/trak.in\/stories\/indian-railways-making-indias-1st-dedicated-track-for-testing-at-rs-820-crore-expense\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/trak.in\/stories\/indian-railways-making-indias-1st-dedicated-track-for-testing-at-rs-820-crore-expense\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/trak.in\/stories\/wp-content\/uploads\/2024\/11\/Screenshot-2024-11-10-at-11.54.50\u202fAM-1.png\",\"datePublished\":\"2024-11-10T06:39:11+00:00\",\"dateModified\":\"2024-11-10T06:39:47+00:00\",\"author\":{\"@id\":\"https:\/\/trak.in\/stories\/#\/schema\/person\/5092a7d2906e3f3c819643435477c2a7\"},\"breadcrumb\":{\"@id\":\"https:\/\/trak.in\/stories\/indian-railways-making-indias-1st-dedicated-track-for-testing-at-rs-820-crore-expense\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/trak.in\/stories\/indian-railways-making-indias-1st-dedicated-track-for-testing-at-rs-820-crore-expense\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/trak.in\/stories\/indian-railways-making-indias-1st-dedicated-track-for-testing-at-rs-820-crore-expense\/#primaryimage\",\"url\":\"https:\/\/trak.in\/stories\/wp-content\/uploads\/2024\/11\/Screenshot-2024-11-10-at-11.54.50\u202fAM-1.png\",\"contentUrl\":\"https:\/\/trak.in\/stories\/wp-content\/uploads\/2024\/11\/Screenshot-2024-11-10-at-11.54.50\u202fAM-1.png\",\"width\":1224,\"height\":808},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/trak.in\/stories\/indian-railways-making-indias-1st-dedicated-track-for-testing-at-rs-820-crore-expense\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/trak.in\/stories\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Indian Railways Making India&#8217;s 1st Dedicated Track For Testing At Rs 820 Crore Expense\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/trak.in\/stories\/#website\",\"url\":\"https:\/\/trak.in\/stories\/\",\"name\":\"Trak.in - Indian Business of Tech, Mobile &amp; Startups\",\"description\":\"Trak.in is a popular Indian Business, Technology, Mobile &amp; Startup blog featuring trending News, views and analytical take on Technology, Business, Finance, Telecom, Mobile, startups &amp; Social Media Space\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/trak.in\/stories\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/trak.in\/stories\/#\/schema\/person\/5092a7d2906e3f3c819643435477c2a7\",\"name\":\"Mohul Ghosh\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/trak.in\/stories\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/66c129d83dd3f325a3b550eb1aa16891173ddfc4686361424206cd9a01311c89?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/66c129d83dd3f325a3b550eb1aa16891173ddfc4686361424206cd9a01311c89?s=96&d=mm&r=g\",\"caption\":\"Mohul Ghosh\"},\"url\":\"https:\/\/trak.in\/stories\/author\/mohul-ghosh\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Indian Railways Making India's 1st Dedicated Track For Testing At Rs 820 Crore Expense - Trak.in - Indian Business of Tech, Mobile &amp; Startups","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/trak.in\/stories\/indian-railways-making-indias-1st-dedicated-track-for-testing-at-rs-820-crore-expense\/","og_locale":"en_US","og_type":"article","og_title":"Indian Railways Making India's 1st Dedicated Track For Testing At Rs 820 Crore Expense - Trak.in - Indian Business of Tech, Mobile &amp; Startups","og_description":"India&#8217;s first dedicated railway test track is under construction in Rajasthan, aimed at providing a specialized facility for testing various types of rolling stock, from high-speed to metro trains. This 60 km track, developed by the Research Designs and Standards Organization (RDSO), features curves and loops to simulate real-world conditions. The track is projected to [&hellip;]","og_url":"https:\/\/trak.in\/stories\/indian-railways-making-indias-1st-dedicated-track-for-testing-at-rs-820-crore-expense\/","og_site_name":"Trak.in - Indian Business of Tech, Mobile &amp; Startups","article_published_time":"2024-11-10T06:39:11+00:00","article_modified_time":"2024-11-10T06:39:47+00:00","og_image":[{"width":1224,"height":808,"url":"https:\/\/trak.in\/stories\/wp-content\/uploads\/2024\/11\/Screenshot-2024-11-10-at-11.54.50\u202fAM-1.png","type":"image\/png"}],"author":"Mohul Ghosh","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Mohul Ghosh","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/trak.in\/stories\/indian-railways-making-indias-1st-dedicated-track-for-testing-at-rs-820-crore-expense\/","url":"https:\/\/trak.in\/stories\/indian-railways-making-indias-1st-dedicated-track-for-testing-at-rs-820-crore-expense\/","name":"Indian Railways Making India's 1st Dedicated Track For Testing At Rs 820 Crore Expense - Trak.in - Indian Business of Tech, Mobile &amp; Startups","isPartOf":{"@id":"https:\/\/trak.in\/stories\/#website"},"primaryImageOfPage":{"@id":"https:\/\/trak.in\/stories\/indian-railways-making-indias-1st-dedicated-track-for-testing-at-rs-820-crore-expense\/#primaryimage"},"image":{"@id":"https:\/\/trak.in\/stories\/indian-railways-making-indias-1st-dedicated-track-for-testing-at-rs-820-crore-expense\/#primaryimage"},"thumbnailUrl":"https:\/\/trak.in\/stories\/wp-content\/uploads\/2024\/11\/Screenshot-2024-11-10-at-11.54.50\u202fAM-1.png","datePublished":"2024-11-10T06:39:11+00:00","dateModified":"2024-11-10T06:39:47+00:00","author":{"@id":"https:\/\/trak.in\/stories\/#\/schema\/person\/5092a7d2906e3f3c819643435477c2a7"},"breadcrumb":{"@id":"https:\/\/trak.in\/stories\/indian-railways-making-indias-1st-dedicated-track-for-testing-at-rs-820-crore-expense\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/trak.in\/stories\/indian-railways-making-indias-1st-dedicated-track-for-testing-at-rs-820-crore-expense\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/trak.in\/stories\/indian-railways-making-indias-1st-dedicated-track-for-testing-at-rs-820-crore-expense\/#primaryimage","url":"https:\/\/trak.in\/stories\/wp-content\/uploads\/2024\/11\/Screenshot-2024-11-10-at-11.54.50\u202fAM-1.png","contentUrl":"https:\/\/trak.in\/stories\/wp-content\/uploads\/2024\/11\/Screenshot-2024-11-10-at-11.54.50\u202fAM-1.png","width":1224,"height":808},{"@type":"BreadcrumbList","@id":"https:\/\/trak.in\/stories\/indian-railways-making-indias-1st-dedicated-track-for-testing-at-rs-820-crore-expense\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/trak.in\/stories\/"},{"@type":"ListItem","position":2,"name":"Indian Railways Making India&#8217;s 1st Dedicated Track For Testing At Rs 820 Crore Expense"}]},{"@type":"WebSite","@id":"https:\/\/trak.in\/stories\/#website","url":"https:\/\/trak.in\/stories\/","name":"Trak.in - Indian Business of Tech, Mobile &amp; Startups","description":"Trak.in is a popular Indian Business, Technology, Mobile &amp; Startup blog featuring trending News, views and analytical take on Technology, Business, Finance, Telecom, Mobile, startups &amp; Social Media Space","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/trak.in\/stories\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/trak.in\/stories\/#\/schema\/person\/5092a7d2906e3f3c819643435477c2a7","name":"Mohul Ghosh","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/trak.in\/stories\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/66c129d83dd3f325a3b550eb1aa16891173ddfc4686361424206cd9a01311c89?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/66c129d83dd3f325a3b550eb1aa16891173ddfc4686361424206cd9a01311c89?s=96&d=mm&r=g","caption":"Mohul Ghosh"},"url":"https:\/\/trak.in\/stories\/author\/mohul-ghosh\/"}]}},"jetpack_featured_media_url":"https:\/\/trak.in\/stories\/wp-content\/uploads\/2024\/11\/Screenshot-2024-11-10-at-11.54.50\u202fAM-1.png","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/posts\/1287228","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/users\/30"}],"replies":[{"embeddable":true,"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/comments?post=1287228"}],"version-history":[{"count":1,"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/posts\/1287228\/revisions"}],"predecessor-version":[{"id":1287232,"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/posts\/1287228\/revisions\/1287232"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/media\/1287231"}],"wp:attachment":[{"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/media?parent=1287228"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/categories?post=1287228"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/tags?post=1287228"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}