{"id":1285699,"date":"2024-09-27T10:28:27","date_gmt":"2024-09-27T04:58:27","guid":{"rendered":"https:\/\/trak.in\/stories\/?p=1285699"},"modified":"2024-09-27T10:28:47","modified_gmt":"2024-09-27T04:58:47","slug":"vande-bharat-sleeper-coach-design-to-be-changed-causing-delay-in-production","status":"publish","type":"post","link":"https:\/\/trak.in\/stories\/vande-bharat-sleeper-coach-design-to-be-changed-causing-delay-in-production\/","title":{"rendered":"Vande Bharat Sleeper Coach Design To Be Changed, Causing Delay In Production"},"content":{"rendered":"\n<p>Due to ongoing discussions over key design modifications and train length specifications, the rollout of 200 sleeper variant Vande Bharat trains may be delayed, as informed in a recent media <a href=\"https:\/\/www.business-standard.com\/india-news\/vande-bharat-sleeper-trains-likely-to-face-delays-amid-design-change-talks-124092500261_1.html\">report<\/a>.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"582\" src=\"https:\/\/trak.in\/stories\/wp-content\/uploads\/2024\/09\/Screenshot-2024-09-07-at-8.10.30\u202fAM-1024x582-1.png\" alt=\"Vande Bharat Sleeper Coach Design To Be Changed, Causing Delay In Production\" class=\"wp-image-1285708\" srcset=\"https:\/\/trak.in\/stories\/wp-content\/uploads\/2024\/09\/Screenshot-2024-09-07-at-8.10.30\u202fAM-1024x582-1.png 1024w, https:\/\/trak.in\/stories\/wp-content\/uploads\/2024\/09\/Screenshot-2024-09-07-at-8.10.30\u202fAM-1024x582-1-300x171.png 300w, https:\/\/trak.in\/stories\/wp-content\/uploads\/2024\/09\/Screenshot-2024-09-07-at-8.10.30\u202fAM-1024x582-1-768x437.png 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p><strong>Likely Delay In Rollout Of Vande Bharat Trains<\/strong><\/p>\n\n\n\n<p>This would be related to the nearly Rs 60,000 crore supply and maintenance contract as it is at the center of these negotiations, said the sources.<\/p>\n\n\n\n<p>Further adding that the progress on the prototype for the sleeper version of Vande Bharat which is awarded under the contract, has been slower than anticipated due to these talks.<\/p>\n\n\n\n<p>Under this agreement, Indian Railways appears to be&nbsp; keen to acquire 24-coach trains.<\/p>\n\n\n\n<p>\u201cThe contract terms allow for altering the coach configuration in each rake. Railways can request 12-, 16-, or 24-coach trains without any increase in costs,\u201d said&nbsp;<\/p>\n\n\n\n<p>&nbsp;A senior official involved in the project as quoted in the media report.<\/p>\n\n\n\n<p>Earlier in mid-2023, the 200 sleeper Vande Bharat trains contract was awarded to Kinet Railway Solutions, alongside a consortium of Bharat Heavy Electricals Ltd (BHEL) and Titagarh Rail Systems (TRS).&nbsp;<\/p>\n\n\n\n<p>They had plans to showcase prototype trains within a year, but it appears that the work is yet to begin.<\/p>\n\n\n\n<p>Besides this, they have given a separate contract to BEML and Chennai\u2019s Integral Coach Factory (ICF) to supply 10 sleeper variant trains.&nbsp;<\/p>\n\n\n\n<p>Its first batch is expected to roll out commercially by the end of this year but they have already displayed some coaches of their prototype earlier this month.<\/p>\n\n\n\n<p><strong>Why Would This Happen?<\/strong><\/p>\n\n\n\n<p>Being an Indo-Russian joint venture, Kinet Railway Solutions secured the order for 120 sleeper variant trains at Rs 120 crore per 16-coach rake.&nbsp;<\/p>\n\n\n\n<p>In addition to this, the BHEL-TRS consortium will supply 80 trains under the same pricing structure.&nbsp;<\/p>\n\n\n\n<p>Regarding the ongoing discussions with Indian Railways,&nbsp; a Kinet spokesperson confirmed about the changes to the scope of the contract.<\/p>\n\n\n\n<p>Adding, \u201cWe are in continuous talks with Indian Railways to finalize the scope adjustments. Once agreed, a new project timeline will be established. Kinet remains committed to fulfilling the contract in collaboration with Indian Railways,\u201d&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Due to ongoing discussions over key design modifications and train length specifications, the rollout of 200 sleeper variant Vande Bharat trains may be delayed, as informed in a recent media report. Likely Delay In Rollout Of Vande Bharat Trains This would be related to the nearly Rs 60,000 crore supply and maintenance contract as it [&hellip;]<\/p>\n","protected":false},"author":30,"featured_media":1285708,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[135],"tags":[5520],"class_list":["post-1285699","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-indian-railways","tag-vande-bharat-sleeper"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.9 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Vande Bharat Sleeper Coach Design To Be Changed, Causing Delay In Production - Trak.in - Indian Business of Tech, Mobile &amp; Startups<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/trak.in\/stories\/vande-bharat-sleeper-coach-design-to-be-changed-causing-delay-in-production\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Vande Bharat Sleeper Coach Design To Be Changed, Causing Delay In Production - Trak.in - Indian Business of Tech, Mobile &amp; Startups\" \/>\n<meta property=\"og:description\" content=\"Due to ongoing discussions over key design modifications and train length specifications, the rollout of 200 sleeper variant Vande Bharat trains may be delayed, as informed in a recent media report. Likely Delay In Rollout Of Vande Bharat Trains This would be related to the nearly Rs 60,000 crore supply and maintenance contract as it [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/trak.in\/stories\/vande-bharat-sleeper-coach-design-to-be-changed-causing-delay-in-production\/\" \/>\n<meta property=\"og:site_name\" content=\"Trak.in - Indian Business of Tech, Mobile &amp; Startups\" \/>\n<meta property=\"article:published_time\" content=\"2024-09-27T04:58:27+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-09-27T04:58:47+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/trak.in\/stories\/wp-content\/uploads\/2024\/09\/Screenshot-2024-09-07-at-8.10.30\u202fAM-1024x582-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"582\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Mohul Ghosh\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Mohul Ghosh\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/trak.in\/stories\/vande-bharat-sleeper-coach-design-to-be-changed-causing-delay-in-production\/\",\"url\":\"https:\/\/trak.in\/stories\/vande-bharat-sleeper-coach-design-to-be-changed-causing-delay-in-production\/\",\"name\":\"Vande Bharat Sleeper Coach Design To Be Changed, Causing Delay In Production - Trak.in - Indian Business of Tech, Mobile &amp; Startups\",\"isPartOf\":{\"@id\":\"https:\/\/trak.in\/stories\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/trak.in\/stories\/vande-bharat-sleeper-coach-design-to-be-changed-causing-delay-in-production\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/trak.in\/stories\/vande-bharat-sleeper-coach-design-to-be-changed-causing-delay-in-production\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/trak.in\/stories\/wp-content\/uploads\/2024\/09\/Screenshot-2024-09-07-at-8.10.30\u202fAM-1024x582-1.png\",\"datePublished\":\"2024-09-27T04:58:27+00:00\",\"dateModified\":\"2024-09-27T04:58:47+00:00\",\"author\":{\"@id\":\"https:\/\/trak.in\/stories\/#\/schema\/person\/5092a7d2906e3f3c819643435477c2a7\"},\"breadcrumb\":{\"@id\":\"https:\/\/trak.in\/stories\/vande-bharat-sleeper-coach-design-to-be-changed-causing-delay-in-production\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/trak.in\/stories\/vande-bharat-sleeper-coach-design-to-be-changed-causing-delay-in-production\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/trak.in\/stories\/vande-bharat-sleeper-coach-design-to-be-changed-causing-delay-in-production\/#primaryimage\",\"url\":\"https:\/\/trak.in\/stories\/wp-content\/uploads\/2024\/09\/Screenshot-2024-09-07-at-8.10.30\u202fAM-1024x582-1.png\",\"contentUrl\":\"https:\/\/trak.in\/stories\/wp-content\/uploads\/2024\/09\/Screenshot-2024-09-07-at-8.10.30\u202fAM-1024x582-1.png\",\"width\":1024,\"height\":582},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/trak.in\/stories\/vande-bharat-sleeper-coach-design-to-be-changed-causing-delay-in-production\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/trak.in\/stories\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Vande Bharat Sleeper Coach Design To Be Changed, Causing Delay In Production\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/trak.in\/stories\/#website\",\"url\":\"https:\/\/trak.in\/stories\/\",\"name\":\"Trak.in - Indian Business of Tech, Mobile &amp; Startups\",\"description\":\"Trak.in is a popular Indian Business, Technology, Mobile &amp; Startup blog featuring trending News, views and analytical take on Technology, Business, Finance, Telecom, Mobile, startups &amp; Social Media Space\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/trak.in\/stories\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/trak.in\/stories\/#\/schema\/person\/5092a7d2906e3f3c819643435477c2a7\",\"name\":\"Mohul Ghosh\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/trak.in\/stories\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/66c129d83dd3f325a3b550eb1aa16891173ddfc4686361424206cd9a01311c89?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/66c129d83dd3f325a3b550eb1aa16891173ddfc4686361424206cd9a01311c89?s=96&d=mm&r=g\",\"caption\":\"Mohul Ghosh\"},\"url\":\"https:\/\/trak.in\/stories\/author\/mohul-ghosh\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Vande Bharat Sleeper Coach Design To Be Changed, Causing Delay In Production - Trak.in - Indian Business of Tech, Mobile &amp; Startups","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/trak.in\/stories\/vande-bharat-sleeper-coach-design-to-be-changed-causing-delay-in-production\/","og_locale":"en_US","og_type":"article","og_title":"Vande Bharat Sleeper Coach Design To Be Changed, Causing Delay In Production - Trak.in - Indian Business of Tech, Mobile &amp; Startups","og_description":"Due to ongoing discussions over key design modifications and train length specifications, the rollout of 200 sleeper variant Vande Bharat trains may be delayed, as informed in a recent media report. Likely Delay In Rollout Of Vande Bharat Trains This would be related to the nearly Rs 60,000 crore supply and maintenance contract as it [&hellip;]","og_url":"https:\/\/trak.in\/stories\/vande-bharat-sleeper-coach-design-to-be-changed-causing-delay-in-production\/","og_site_name":"Trak.in - Indian Business of Tech, Mobile &amp; Startups","article_published_time":"2024-09-27T04:58:27+00:00","article_modified_time":"2024-09-27T04:58:47+00:00","og_image":[{"width":1024,"height":582,"url":"https:\/\/trak.in\/stories\/wp-content\/uploads\/2024\/09\/Screenshot-2024-09-07-at-8.10.30\u202fAM-1024x582-1.png","type":"image\/png"}],"author":"Mohul Ghosh","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Mohul Ghosh","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/trak.in\/stories\/vande-bharat-sleeper-coach-design-to-be-changed-causing-delay-in-production\/","url":"https:\/\/trak.in\/stories\/vande-bharat-sleeper-coach-design-to-be-changed-causing-delay-in-production\/","name":"Vande Bharat Sleeper Coach Design To Be Changed, Causing Delay In Production - Trak.in - Indian Business of Tech, Mobile &amp; Startups","isPartOf":{"@id":"https:\/\/trak.in\/stories\/#website"},"primaryImageOfPage":{"@id":"https:\/\/trak.in\/stories\/vande-bharat-sleeper-coach-design-to-be-changed-causing-delay-in-production\/#primaryimage"},"image":{"@id":"https:\/\/trak.in\/stories\/vande-bharat-sleeper-coach-design-to-be-changed-causing-delay-in-production\/#primaryimage"},"thumbnailUrl":"https:\/\/trak.in\/stories\/wp-content\/uploads\/2024\/09\/Screenshot-2024-09-07-at-8.10.30\u202fAM-1024x582-1.png","datePublished":"2024-09-27T04:58:27+00:00","dateModified":"2024-09-27T04:58:47+00:00","author":{"@id":"https:\/\/trak.in\/stories\/#\/schema\/person\/5092a7d2906e3f3c819643435477c2a7"},"breadcrumb":{"@id":"https:\/\/trak.in\/stories\/vande-bharat-sleeper-coach-design-to-be-changed-causing-delay-in-production\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/trak.in\/stories\/vande-bharat-sleeper-coach-design-to-be-changed-causing-delay-in-production\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/trak.in\/stories\/vande-bharat-sleeper-coach-design-to-be-changed-causing-delay-in-production\/#primaryimage","url":"https:\/\/trak.in\/stories\/wp-content\/uploads\/2024\/09\/Screenshot-2024-09-07-at-8.10.30\u202fAM-1024x582-1.png","contentUrl":"https:\/\/trak.in\/stories\/wp-content\/uploads\/2024\/09\/Screenshot-2024-09-07-at-8.10.30\u202fAM-1024x582-1.png","width":1024,"height":582},{"@type":"BreadcrumbList","@id":"https:\/\/trak.in\/stories\/vande-bharat-sleeper-coach-design-to-be-changed-causing-delay-in-production\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/trak.in\/stories\/"},{"@type":"ListItem","position":2,"name":"Vande Bharat Sleeper Coach Design To Be Changed, Causing Delay In Production"}]},{"@type":"WebSite","@id":"https:\/\/trak.in\/stories\/#website","url":"https:\/\/trak.in\/stories\/","name":"Trak.in - Indian Business of Tech, Mobile &amp; Startups","description":"Trak.in is a popular Indian Business, Technology, Mobile &amp; Startup blog featuring trending News, views and analytical take on Technology, Business, Finance, Telecom, Mobile, startups &amp; Social Media Space","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/trak.in\/stories\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/trak.in\/stories\/#\/schema\/person\/5092a7d2906e3f3c819643435477c2a7","name":"Mohul Ghosh","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/trak.in\/stories\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/66c129d83dd3f325a3b550eb1aa16891173ddfc4686361424206cd9a01311c89?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/66c129d83dd3f325a3b550eb1aa16891173ddfc4686361424206cd9a01311c89?s=96&d=mm&r=g","caption":"Mohul Ghosh"},"url":"https:\/\/trak.in\/stories\/author\/mohul-ghosh\/"}]}},"jetpack_featured_media_url":"https:\/\/trak.in\/stories\/wp-content\/uploads\/2024\/09\/Screenshot-2024-09-07-at-8.10.30\u202fAM-1024x582-1.png","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/posts\/1285699","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/users\/30"}],"replies":[{"embeddable":true,"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/comments?post=1285699"}],"version-history":[{"count":1,"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/posts\/1285699\/revisions"}],"predecessor-version":[{"id":1285709,"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/posts\/1285699\/revisions\/1285709"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/media\/1285708"}],"wp:attachment":[{"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/media?parent=1285699"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/categories?post=1285699"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/trak.in\/stories\/wp-json\/wp\/v2\/tags?post=1285699"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}